I finished the poured adobe portion of the floor today. The section we did last week was still too wet to walk on so I estimate we have at least two weeks to wait before we can think about sealing it with boiled linseed oil. I’m sure I can find something to keep me busy in the meantime.
![](https://i0.wp.com/4.bp.blogspot.com/-b8LcyDAIJpc/WMzBbB9N6-I/AAAAAAAAGcE/iJJSXNyEH_o1QtoMW_prWPnMK3nK_MeHwCLcB/s640/IMG_1921.JPG?resize=480%2C640&ssl=1) |
This will probably be the last day I used the concrete mixer for this project. Hurrah! It survived! |
![](https://i0.wp.com/2.bp.blogspot.com/-u1mMFPp7JoQ/WMzBaTrntHI/AAAAAAAAGcA/Dsf7f5cWbywxGIsRSuR8in8IqKuNA4V5wCLcB/s640/IMG_1925.JPG?resize=640%2C480&ssl=1) |
Jean and Currell did a great job on the east and west sides of the building last week. I’m finishing up the center. |