T-Brick Shed: Poured Adobe Floor

I finished the poured adobe portion of the floor today. The section we did last week was still too wet to walk on so I estimate we have at least two weeks to wait before we can think about sealing it with boiled linseed oil. I’m sure I can find something to keep me busy in the meantime.

This will probably be the last day I used the concrete mixer for this project. Hurrah! It survived!

Jean and Currell did a great job on the east and west sides of the building last week. I’m finishing up the center.