T-Brick Shed: Finishing the Foundation
The last load of gravel for a grand total of five cubic yards. There are 27 cubic feet in a […]
Read more →Homesteading in the Suburbs
The last load of gravel for a grand total of five cubic yards. There are 27 cubic feet in a […]
Read more →This is what I did during the part of the weekend I wasn’t shoveling gravel. Looks like fun huh? Removing […]
Read more →Finished up the installation of the french drain and went through two and a half cubic yards of gravel today. […]
Read more →The last thing Jean told me before she left for the UK was that I had better finish the shed […]
Read more →I had planned on starting installation of the french drain and rubble trench foundation today but unfortunately/fortunately it rained earlier […]
Read more →The Mattock We spend part of the Labor day weekend leveling and widening the foundation trench. I bought a Mattock […]
Read more →The plan is to put in a rubble trench foundation. A rubble trench is a trench filled with rubble or […]
Read more →As a test project for working with earthen materials I’m planning to build a small tool/storage shed. For the wall […]
Read more →I went to a Roundwood Building Workshop this weekend. Roundwood is timber that is left as logs rather than being […]
Read more →Note: If you watch the slide show in full screen mode, the Show Infobutton will give you details about the […]
Read more →